Mandatory: No passport date set yet

Construction Passports — your DoP and EPD, structured

Upload your Declaration of Performance and EN 15804 EPD. The AI suggests the values they support, each linked to its source page, for you to approve; TracePass hosts the PDFs as evidence and publishes a per-batch passport you can QR-label at the factory gate.

Template size
54 fields
Deadline
No passport date set yet
Regulation
Construction Products Regulation
Setup time
< 1 day

Our promise

Compliance-ready in 2–4 weeks, without changing your existing systems.

Who this is for

Manufacturers of insulation, windows, doors, plasterboard, concrete, structural steel, glazing, roofing, and sanitary products under harmonised technical specifications.

How TracePass helps — Construction

Concrete things TracePass does for this category — not a list of what the regulation requires.

Attach your existing DoP PDF; we read it for essential-characteristics values and hold the PDF as evidence per field.

Attach your EN 15804 EPD; AI extracts carbon footprint and lifecycle data from the document so values are linked to their source rather than re-keyed from a summary.

Fire safety as one structured object — reaction-to-fire Euroclass, fire resistance (REI) and external fire performance — not a free-text line.

No manufacturer-specific EPD yet? The EPD fields can stay empty until yours arrives: no law requires an EPD in the passport today, so nothing is blocked.

Batch-level passports (not per-item): one DPP per production batch with the batch number as serial. Matches how the industry already tracks.

Field coverage modelled on the basic requirements for construction works in Annex I of the Construction Products Regulation (Regulation (EU) 2024/3110), the basis on which essential characteristics are identified — the schema holds the characteristics you declare in seven structured performance fields, not a free-text catch-all. Annex I lists eight requirements; dangerous-substance release, which spans hygiene and health (3) and outdoor emissions (7), shares one field.

What's in the Construction template

54 fields — The fields aren't abstract — here are the groups you'll actually work with:

  • DoP + essential characteristics (per harmonised standard)
  • Fire reaction + fire resistance class
  • Dangerous-substance release + water permeability
  • Thermal / acoustic / mechanical performance
  • EN 15804 EPD carbon footprint + lifecycle
  • Recycled + bio-based content %
  • Installation + maintenance URLs

Questions buyers in this category ask

Most small manufacturers don't have EN 15804 EPDs yet. Can we still be compliant?

Yes. Until you have your own EN 15804 EPD, the carbon and lifecycle fields stay empty for you to fill. When your EPD arrives, you attach it and the AI extracts the values from it, each linked to its source.

One passport per batch or per product family?

Per batch — that's how construction already tracks. Declaration-of-Performance numbers usually change per batch anyway. TracePass stores the batch number on each passport and the product-family metadata on the shared product record.

Does the construction DPP replace our Declaration of Performance, or is it a separate thing we now have to maintain twice?

It doesn't replace the DoP — under the Construction Products Regulation (CPR, Reg (EU) 2024/3110) the DPP becomes the digital carrier that makes your DoP and EN 15804 EPD machine-readable and publicly accessible behind a GS1 Digital Link QR. TracePass reads your existing DoP and EPD once and structures them into the 54 CPR fields, so you maintain the source documents you already issue, not a second parallel dataset. When a value changes, you update it in one place and the published passport reflects it.

If the AI fills our declared performance values from the DoP, who's accountable when a number is wrong?

You are — TracePass never publishes anything on its own. The AI proposes each value it can source, with a confidence score and a link back to the exact DoP or EN 15804 EPD page it pulled the value from; fields it can't source stay empty for you to fill, and nothing goes live until you review and approve it. That source attribution means your compliance reviewer can verify every declared performance value against the original document instead of trusting a black box, which is exactly the audit trail a CPR market-surveillance check expects.

Related product categories

Ready to generate construction passports?

We're onboarding design partners now. The manufacturers who land first are the ones who move before the deadline pressure — that's our speed advantage and yours.

Reviewed by Malin Ivanov, Managing Director — on