Mandatory: 2027–2029 (CPR rollout)

Construction Passports — your DoP and EPD, structured

Upload your Declaration of Performance and EN 15804 EPD. TracePass structures them into 48 CPR-ready fields, hosts the PDFs as evidence, and publishes a per-batch passport you can QR-label at the factory gate.

Template size
48 fields
Deadline
2027–2029 (CPR rollout)
Regulation
Construction Products Regulation
Setup time
< 1 day

Our promise

Compliance-ready in 2–4 weeks, without changing your existing systems.

Who this is for

Manufacturers of insulation, windows, doors, plasterboard, concrete, structural steel, glazing, roofing, and sanitary products under harmonised technical specifications.

How TracePass helpsConstruction

Concrete things TracePass does for this category — not a list of what the regulation requires.

Attach your existing DoP PDF; we read it for essential-characteristics values and hold the PDF as evidence per field.

EPD lookup from ECO Platform + manufacturer sustainability pages fills carbon footprint + lifecycle data automatically.

Fire / reaction / VOC class as structured enum fields — not free text — so regulators parse them reliably.

When your product doesn't have a manufacturer-specific EPD yet, we attach the category-default EPD with clear provenance so the passport is still compliant during transition.

Batch-level passports (not per-item): one DPP per production batch with the batch number as serial. Matches how the industry already tracks.

What's in the Construction template

48 fieldsThe fields aren't abstract — here are the groups you'll actually work with:

Questions buyers in this category ask

Most small manufacturers don't have EN 15804 EPDs yet. Can we still be compliant?

Yes. The template falls back to category-average EPD values (from ECO Platform) with explicit provenance in the evidence field. When your own EPD arrives, you replace the value and the audit trail records the upgrade.

One passport per batch or per product family?

Per batch — that's how construction already tracks. Declaration-of-Performance numbers usually change per batch anyway. TracePass stores the batch number on each passport and the product-family metadata on the shared product record.

Ready to generate construction passports?

We're onboarding design partners now. The manufacturers who land first are the ones who move before the deadline pressure — that's our speed advantage and yours.